Renovations Three: Living room basically done

The professional flooring (and door repair) is completed. I have been working basically 8 am to 10 pm with breaks the previous three days. I still have massive clean-up, mainly with the property of the Boss, that lived downstairs and now lives down the road, in residence. I have taken her former main floor over as well as keeping my top floor. I also need to set-up my academic library. This time in a storage room, not my loft.

The seating is brand new, as is the flooring. The rug, I believe was made by Grandma Berreth when I was very little, or before.
Still a ways to go. The new dishwasher will not be installed until February 16, and the old one removed.